

Washington DC Transformer Oil Removal
Rapid PCB Screening
Closed Vacuum Transfer
DOEE Manifest & Disposal
Field testing and laboratory sample verification to determine PCB concentrations per EPA Title 40 regulations before hose connection or mechanical displacement.
Direct extraction through sealed, high-volume pumping lines into dedicated stainless tankers, preventing atmospheric venting or containment berm breach.
Issuance of full cradle-to-grave transport manifests conforming to District Department of Energy and Environment standards and certified recycling facilities.
District Utility Support Metrics
100%
DOEE & EPA compliant manifests
< 50 ppm
Certified PCB classification threshold
5,000 gal
Single-load vacuum tanker capacity
24/7
Emergency containment response
Schedule Substation Extraction Today
Coordinate planned transformer maintenance, emergency mineral oil drainage, or complete facility decommissioning with our certified hazardous liquid transport team.
